Mission chapter 06

🇸🇾 Syria

March 2027 · Damascus · selected Rural Damascus catchments

Planned
Complete country model

Education · Mosques · Water & WASH · Relief · Housing & Welfare

Planned—not active

The travelling component is conditional on lawful access, specialist safety screening and suitable local delivery arrangements.

View the full 2026-27 mission

Syria programme

Five connected programme areas.

Select an area to inspect the planned local scale and the checks required before it can move beyond planned status.

Planned target · 01

3 facilities · 420 places

Three school rehabilitations in repairable, approved buildings after structural and explosive-hazard clearance.

Bidaya supports modest school blocks, repairs, learning spaces and the practical systems that help education continue. Construction is only one part of opening a safe, functioning place to learn.

What must be checked
  • Safe structure and services
  • Appropriate local permission
  • Named operator and teaching plan

Continuation plan

The visit is not the endpoint.

Every planned water intervention includes an operator, maintenance route and 30/90-day functionality checks. The working plan also funds six months of local completion supervision.

12 months

Planned school and mosque operating support from opening.

6 months

Planned local coordination and engineering follow-up after departure.

Explore the complete seven-country plan.

Open mission trackerAll countries